cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Who Me Too'd this topic

15 min interval report in UCCX HRC

lohjintiam
Level 4
Level 4
Hi all, Currently most of the UCCX HRC reports by interval are by 30 / 60 min interval. Can an additional interval be added (15 min) through the following? a) updating the filter criteria in XML or b) a new stored procedure needs to be created Thanks! -JT-
Who Me Too'd this topic