cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Who Me Too'd this topic

Microsoft PowerBI with CUIC

michael.manea1
Level 1
Level 1

Hello Community,

since some weeks i'am working with Microsoft PowerBI for different Reports, the last days i saw there is also a Informix Connector.
So i tried to get from the PowerBI to the CUIC DB to have all the information as a easy use Report.

But i was not able to get a connection to the System. Errormessage

Details: "Microsoft Informix Client: The connect timeout period expired before the DRDA server responded to the DRDA client connection request. SQLSTATE=HYT01 SQLCODE=-7049

Does anyone of you tried the same or have any ideas how to get the connection?

Best regards
Michael

Who Me Too'd this topic