03-06-2007 11:44 AM - edited 03-05-2019 02:44 PM
I am doing burn-in of some new C3750 switches. I've been asked to provide "burn-in" test results.
Does "sh logging buffered" suffice for results for this request?
or
should a "diagnostic start switch x test all" be done and then save THOSE results?
Thanks for any input.