04-24-2007 04:52 PM - edited 03-03-2019 04:41 PM
i would like to add an addition switch
3750G 48PS to a production stack which is having 3750 ( not 3750G). what do i need to be prepare?
thanks
04-24-2007 07:50 PM
Hi
The good thing about stacking is that your operations wont affect.
Just make sure that while connecting the new switch to the existing stack using the stacking cable, you do not pull both the port's cable. Let one be there. This will continue the operation flow.
After you have introduced the new member, everything will be back to normal as it were.
Here are the following links which can help you
Regards
JD
04-24-2007 08:13 PM
Hello,
There are few things to be considered when you connect a new switch to a running stack. Please see the link below for managing switch stacks on 3750:
http://www.cisco.com/univercd/cc/td/doc/product/lan/cat3750/12235se/scg/swstack.htm#wp1189523
HTH,Please rate if it does.
-amit singh
04-24-2007 11:17 PM
does the new switch 3750G will take the master role of the 3750 Stack? because it has the higher speed port.
04-24-2007 11:30 PM
Hi there,
No it shouldn't, take a look on this list:
http://www.cisco.com/univercd/cc/td/doc/product/lan/cat3750/12235se/scg/swstack.htm#wp1152806
HTH,
Mohammed Mahmoud.
04-25-2007 08:00 AM
thank you very much .... Mahmoud