I have a site with 3 T1's with a multi-link bundle created. The site is not in the best location so the T1's have a fair amount of issues. There will be times where 1 T1 will start taking on a lot of errors and I have to manually remove the T1 from the bundle to bring it back up.
Is there a way to write some sort of SLA that if a T1 starts taking on a bunch of errors that interface can either be shut down or removed from the bundle?
Thanks