In my environment I have 2 vSmart controllers. (vSmart-1, vSmart-2)
In cEdge-1, the OMP peer is established only with vSmart-1. No details about peering with vSmart-2.
in cEdge-2. the OMP peer is established with vSmart-1, for vSmart-2, the status is in init-in-gr.
Does the above means for cEdge-1, OMP peering with vSmart-2 the OMP graceful restart timer has expired & it is remvod from the peering.
For cEdge-2., for vSmart-2, it has entered into OMP graceful restart timer. Once the timer expires, the entry will be removed from the entry.
Is my above understandings are right ?