Hi all,
I'm building a Cisco UCS Lab Enviroment for our company.We have couple of C-200s and a couple of B-200s.I ordered 2 MDS 9124 and 2 Nexus 5548UP for use them on the labs for providing some fc/fcoe actions to the blades..but..the switches has not arrived.The point is i have no SAN switch etc. but i have to configure storage access to the blades.
So is there any validated design or some guides about how to directly attach a NetApp 2020 to 6120 Interconnects.and most important thing is how to configure them..