cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
309
Views
0
Helpful
1
Replies

3750 Stackwise problem

nelsonm
Level 1
Level 1

I have a stack consisting of 7 3750 switches, mixed 24T and 48P... When I hit the stack mode button between my switch 2 and 3 the port 23 on Switch 2 and the port 24 on switch 3 are amber.. ALl other switches in the stack have green lights indicating good link. Is this a potential bad cable or port? How can I verify. If it is a bad cable, can I replace without taking down the remaining stack members

Thanks

1 Reply 1

b.hsu
Level 5
Level 5

Catalyst 3750-E switch StackWise cable: remove and inspect the cable and StackWise port for bent pins or damaged connectors. If the StackWise cable is bad, replace it with a known good cable.

For more information please click following URL:

http://www.cisco.com/en/US/products/ps7077/products_installation_guide_chapter09186a0080763909.html#wp1065008

Review Cisco Networking for a $25 gift card