- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
04-24-2020 02:51 PM
lighting up a 9500 StackwiseVirtual switch running 16.12.x
Have Mgmt-vrf interfaces up and operational when 9500 switches are new. When I create the Stackwise stack the Mgmt int in switch 2 no longer responds. When reloading switch 1 I am unable to manage the stackwise stack with the Mgmt int as switch1 in the stack is reloading. Cant find any reference documentation for setup of the Mgmt int in a switch2 in a stackwise configuration. Any pointers?
Solved! Go to Solution.
- Labels:
-
Catalyst 9000
Accepted Solutions
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
04-24-2020 03:10 PM - edited 04-24-2020 03:11 PM
Config wise, you only configure one interface but you need to have 2 physical cables (one connected to each OOB port). When one switch fails, the same config applies to the other switch and as long as you have both cables connected the other management port will take over.
HTH
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
04-24-2020 02:59 PM
Only 1 management interface is available on the stack when both are up. In order to keep managing the stack when on 1 switch is rebooting you have to have both management interfaces cabled up and connected on the same management vlan. Here's some documentation that may help:
HTH,
Barry
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
04-24-2020 03:10 PM - edited 04-24-2020 03:11 PM
Config wise, you only configure one interface but you need to have 2 physical cables (one connected to each OOB port). When one switch fails, the same config applies to the other switch and as long as you have both cables connected the other management port will take over.
HTH
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
04-25-2020 08:24 AM
Also noticed the arp entry for the gig 0/0 interface had changed when moving mgmt. to second switch as well. Required a sufficient time to clear before the second switch was reachable via the same address.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
04-25-2020 12:04 PM
Hi Patrick,
Required a sufficient time to clear before the second switch was reachable via the same address.
It should not take that long for the second port to take over. If you are connecting the ports to an OOB switch, make sure to enable portfast on the OOB switch ports. This should improve convergence time.
HTH
