06-21-2011 05:13 PM - edited 03-07-2019 12:55 AM
When attempting to add a 3750 to an exsting stack of 4 switches, I had an issue where I removed the stack cable from the 4th switch connected to the new switch which is going to be the 5th switch. Once the new switch had the stack cables connected I powered it on. I then did a sho switch and the 4th switch thought it was removed from the stack.
switch 1 is the master priority 15
switch 2 14
switch 3 13
switch 4 12
switch 5 11
06-21-2011 06:50 PM
Have a look at this document. It explain how to add a new switch to an existing stack
HTH
06-21-2011 07:59 PM
Hi,
You can have a look at the followind document also:
This will explain you how to add a switch to stack as member or as a master.
Hope that helps.
Sweta
06-22-2011 05:39 AM
Hi,
If you still have problem, can you help with show switch output ?