Hello,
I am attempting to add and Catalyst 3750 - 12 port Gigabit switch to an existing stack of 3750 48 port switches (non-X fabric). I am not sure how to proceed. These are the two questions/thoughts I have. Please share any additional perspective I should have before proceeding. Thanks!!
- What kind of configuration should I apply to the Gig switch before adding it to the stack?
- I am sure I will need to assign priority to the new switch, ideally, it will act as master.