06-09-2020 06:58 AM
Hello everyone.
Our company has purchased 2 Catalyst 9300 switches for one of our customers.
I need to setup stack and paste actual config from old pair to this new pair.
After that new pair will be racked in customer's DC and directed to their local CSSM (Satellite) to get licence.
Will it work in this way ?
Do I have some period of time for this actions (like trial period) or I need to register the switches right away, prior to configuration and replacement old switches with new ?
Thanks in advance.
06-09-2020 07:28 AM
Hi,
Is the new switches don't come with the correct license, you usually have at least a 90 day trail period to get the right license install. If you are going to stack them, make sure both switches have the same IOS and the same license installed.
HTH
06-09-2020 09:44 AM
Thanks Reza.
But can I do all the tasks (including configuration and stacking) prior to licensing ?
And licensing in last turn.
06-09-2020 10:08 AM
Hi,
Yes, you can do everything before finalizing the license. Just make sure whatever license they come with is the same for both switches. When you install the finial licenses, you would have to reboot the switches in order for the new license to take effect but that can be done later on down the road.
HTH
06-09-2020 12:01 PM
Make sure command syntax is correct when moving the config, - I would not suggest mass pasting the config.
Do stage by stage config on the new switches, so you can see any errors when you pasting the config.
you have plenty of time to connect to the local SSM server for License.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide