Hi All,
I would like to know the following questions.Pls help me
I have 2960X data stack two switch,one is active and one is member(only data stack,no power stack) that are connected to one for PDU A and one for PDU B.The coming day datacenter will be shut down the power on PDU A.In this case,Active 2960X must be shutdown.I would like to know this Active 2960X can replace active when power on or need to reboot member switch.I configure priority level 15 for active and 5 for member.
Cheers!
Kaung Myat