03-30-2011 03:31 AM - edited 03-06-2019 04:21 PM
Good Morning,
I have been tasked into stacking two of our distribution layer 3750-12S switches.
Both of these switches are managed individually via management addresses.
My main question is, when I have elected the master out of the two, will i have to clear the configuration on the second switch before connecting to the master?
We are hoping to do this in a live environment but it can be powered down if needed.
Any advise will be most appreciated.
Sully
Solved! Go to Solution.
03-30-2011 05:23 AM
Hi
This is how I would have done it
First check that the IOS are compatible.(same).
Backup the both configurations.
Erase the config on the one you want as non master
Pull the power on the one you want as non master.
Attach the datastack cables in a correct way.
Power on the non master
Let it join the stack (it will loose the master selection of stack due to the other switch beeing up and configured and so on.)
Check that the config of the stack works and recognices the new switch
Configure the new ports of the new stack.
Done
Good luck
HTH
03-30-2011 05:23 AM
Hi
This is how I would have done it
First check that the IOS are compatible.(same).
Backup the both configurations.
Erase the config on the one you want as non master
Pull the power on the one you want as non master.
Attach the datastack cables in a correct way.
Power on the non master
Let it join the stack (it will loose the master selection of stack due to the other switch beeing up and configured and so on.)
Check that the config of the stack works and recognices the new switch
Configure the new ports of the new stack.
Done
Good luck
HTH
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide