10-13-2013 07:06 AM - edited 03-07-2019 04:00 PM
Hi Gents,
I recently found out that obe of the stack port on my 3750x is faulty thus failig the ring status of my 2x3750x. With the troubkeshooting that i did, i finaly concluded that the problem is on the port of the master switch. See status below.
Switch# Port 1 Port 2 Port 1 Port 2
--------------------------------------------------------
1 Ok Down 2 None
2 Down Ok None 1
Now i'm a bit hesitant in doing the ptocedure that i have in mind. If sone please connfirm if my procedure is correct. Take note that this is a live environment.
-turn off switch1(master)
-switch 2 shoould take over as master.
-connect the new switch (rna'd switch to replace the master)
-reload the entire stack and switch one should take over the mastet state and get the config from switcch 2.
Thats what i have in mind, if someone could please verify if i'm right?. Thanks guys!
Sent from Cisco Technical Support iPhone App
10-13-2013 09:38 AM
Hi,
Please follow this document step-by-step to add a switch to the stack.
HTH
10-13-2013 09:44 AM
Hi Erwin,
To add a switch, as a master, to a stack, complete these steps:
Note: Make sure the switch you add into the stack has the same IOS version as the switches in the stack. Refer to Catalyst 3750 Software Upgrade in a Stack Configuration with Use of the Command-Line Interface to upgrade the IOS in a catalyst 3750 switch.
Issue the show switch command.to get the priority value of the members of the stack.
3750-Stk>show switch
Current
Switch# Role Mac Address Priority State
--------------------------------------------------------
1 Slave 0016.4748.dc80 1 Ready
*2 Master 0016.9d59.db00 5 Ready
Change the priority value of the switch to be added to a value greater than the highest priority of the stack. In the illustration, the priority value has to be a value of more than "5.".
switch stack-member-number priority new-priority-value
Make sure that the stack is fully connected so that, when you connect the new switch, the stack will be at least in half connectivity, and do not partition.
With the new switch powered on, connect the StackWise ports of the switch to the stack.
The election for the stack master occurs, and the new switch will be elected as the master since it has the highest priority value.
The members of the previous stack will reboot themselves to join the new stack. After all the members come up, issue the command show switch to verify stack membership.
Reference:
10-13-2013 03:59 PM
Hi!
I will be replacing a failty master switchand will no add a new one. I believe the procedures mentioned above is for asding a new master switch.
If i powered off the existing master, will the slave take over?
And when i connect the new switch to the stack, will it take over as a mastet and as a switch 1?
Will it download the config from switch 2?
Sent from Cisco Technical Support iPhone App
10-13-2013 04:49 PM
If i powered off the existing master, will the slave take over?
Yes and this is what you want.
And when i connect the new switch to the stack, will it take over as a mastet and as a switch 1?
No it won't because you did not specify the switch priority and you did not reboot the stack.
If you want the new switch to take over, configure the switch priority (after the new switch has joined the stack) and reboot the stack.
10-13-2013 04:53 PM
Hi Leo,
Thanks!
If I plugged in the new switch, will it be switch number 1? I just dont want to mess up the ibterface configs and number.
And will it not ibherit the current priority set to switch 1?
Sent from Cisco Technical Support iPhone App
10-13-2013 05:37 PM
If I plugged in the new switch, will it be switch number 1?
Yes.
And will it not ibherit the current priority set to switch 1?
Yes.
10-14-2013 12:07 AM
Thanks mate!
Here's the show switch stack-ports summary output incase you noticed sonething other than a physical problem.
witch01#sh switch stack-ports summary
Switch#/ Stack Neighbor Cable Link Link Sync # In
Port# Port Length OK Active OK Changes Loopback
Status To LinkOK
-------- ------ -------- -------- ---- ------ ---- --------- --------
1/1 OK 2 50 cm Yes Yes Yes 1 No
1/2 Down None 50 cm No No No 5 No
2/1 Down None 50 cm No No Yes 5 No
2/2 OK 1 50 cm Yes Yes Yes 1 No
switch01#
I just noticed that 'sync ok' is set to 'yes' on the switch 2 port 1
Sent from Cisco Technical Support iPhone App
10-14-2013 01:02 AM
Post "sh switch detail" & "sh version".
Sent from Cisco Technical Support Nintendo App
10-14-2013 01:19 AM
witch#sh switch detail
Switch/Stack Mac Address : fc99.47c0.8500
H/W Current
Switch# Role Mac Address Priority Version State
----------------------------------------------------------
*1 Master fc99.47c0.8500 15 1 Ready
2 Member fc99.47c3.5880 14 1 Ready
Stack Port Status Neighbors
Switch# Port 1 Port 2 Port 1 Port 2
--------------------------------------------------------
1 Ok Down 2 None
2 Down Ok None 1
switch#sh swi
switch#sh ver
Cisco IOS Software, C3750E Software (C3750E-UNIVERSALK9-M), Version 12.2(55)SE3, RELEASE SOFTWARE (fc1)
Technical Support: http://www.cisco.com/techsupport
Copyright (c) 1986-2011 by Cisco Systems, Inc.
Compiled Thu 05-May-11 15:40 by prod_rel_team
Image text-base: 0x00003000, data-base: 0x02800000
ROM: Bootstrap program is C3750E boot loader
BOOTLDR: C3750E Boot Loader (C3750X-HBOOT-M) Version 12.2(53r)SE2, RELEASE SOFTWARE (fc1)
switch uptime is 19 weeks, 4 days, 4 hours, 26 minutes
System returned to ROM by power-on
System restarted at 14:01:46 AEST Thu May 30 2013
System image file is "flash:/c3750e-universalk9-mz.122-55.SE3/c3750e-universalk9-mz.122-55.SE3.bin"
This product contains cryptographic features and is subject to United
States and local country laws governing import, export, transfer and
use. Delivery of Cisco cryptographic products does not imply
third-party authority to import, export, distribute or use encryption.
Importers, exporters, distributors and users are responsible for
compliance with U.S. and local country laws. By using this product you
agree to comply with applicable laws and regulations. If you are unable
to comply with U.S. and local laws, return this product immediately.
A summary of U.S. laws governing Cisco cryptographic products may be found at:
http://www.cisco.com/wwl/export/crypto/tool/stqrg.html
If you require further assistance please contact us by sending email to
export@cisco.com.
License Level: ipservices
License Type: Permanent
Next reload license Level: ipservices
cisco WS-C3750X-24 (PowerPC405) processor (revision A0) with 262144K bytes of memory.
Last reset from power-on
4 Virtual Ethernet interfaces
1 FastEthernet interface
56 Gigabit Ethernet interfaces
4 Ten Gigabit Ethernet interfaces
The password-recovery mechanism is enabled.
Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
* 1 30 WS-C3750X-24 12.2(55)SE3 C3750E-UNIVERSALK9-M
2 30 WS-C3750X-24 12.2(55)SE3 C3750E-UNIVERSALK9-M
Sent from Cisco Technical Support iPhone App
10-14-2013 04:27 AM
Output looks good. The only issue I can see is that your stack is only connected with only ONE stacking cable.
This means you don't have redundancy and your stacking "ring" is operating at half speed.
10-14-2013 05:49 AM
Thanks! So by the output can we conclude that its a hardware fault?
Sent from Cisco Technical Support iPhone App
10-14-2013 02:17 PM
So by the output can we conclude that its a hardware fault?
Not a hardware fault. Someone possibly did not cable up the 2nd cable properly.
10-14-2013 04:27 PM
We already replaced the 2ndcable with a new one as advise by cusco tac hut ti ni avail. Now we are replacing the switch as it might be the stack port that is faulty.
Sent from Cisco Technical Support iPhone App
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide