cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
272
Views
5
Helpful
1
Replies

New 4510 switch

mburguk1000
Level 1
Level 1

We have a new 4507 switch which has 2 x supervisor engines, when we configure the switch do we only need to console into one of the engines ports and once configured and saved will the config be on both supervisor engines in the event of one failing THks

1 Reply 1

Giuseppe Larosa
Hall of Fame
Hall of Fame

HelloMark ,

this happens after you have configured correctly a redundancy strategy

use the following as a reference for SSO or RPR strategies

http://www.cisco.com/en/US/docs/switches/lan/catalyst4500/12.2/46sg/configuration/guide/RPR.html

Hope to help

Giuseppe

Review Cisco Networking for a $25 gift card