08-30-2016 08:18 PM - edited 03-08-2019 07:13 AM
We have a Catalyst 6513-E with 2 supervisor 2T modules in it, and it is set up for redundancy
the primary supervisor failed and brought down the whole switching system (not sure why a graceful failover didn't happen)
When I get the replacement for the primary, what will happen when I insert the new blade? Will it sync the configurations and go back to the way it was?
Solved! Go to Solution.
08-30-2016 08:41 PM
When I get the replacement for the primary, what will happen when I insert the new blade?
Make sure the IOS is the same as the existing Sup2T and the replacement supervisor card should be able to synchronize with the existing Sup2T.
08-30-2016 09:01 PM
08-30-2016 08:41 PM
When I get the replacement for the primary, what will happen when I insert the new blade?
Make sure the IOS is the same as the existing Sup2T and the replacement supervisor card should be able to synchronize with the existing Sup2T.
08-30-2016 08:44 PM
since it was the primary, should I take the secondary (which is now active) out of slot 8 and put it into slot 7 first? Or is there no need to do that?
08-30-2016 09:01 PM
Or is there no need to do that?
That action is unnecessary.
08-31-2016 02:03 PM
Thanks for taking the time to rate our posts, Colin. :)
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide