Replacement of failed Supervisor 2T

Colin Higgins
Level 2
Level 2

We have a Catalyst 6513-E with 2 supervisor 2T modules in it, and it is set up for redundancy

the primary supervisor failed and brought down the whole switching system (not sure why a graceful failover didn't happen)

When I get the replacement for the primary, what will happen when I insert the new blade? Will it sync the configurations and go back to the way it was?

2 Accepted Solutions

Accepted Solutions

Leo Laohoo
Hall of Fame
Hall of Fame

When I get the replacement for the primary, what will happen when I insert the new blade?

Make sure the IOS is the same as the existing Sup2T and the replacement supervisor card should be able to synchronize with the existing Sup2T.

View solution in original post

Or is there no need to do that?

That action is unnecessary.

View solution in original post

4 Replies 4

Leo Laohoo
Hall of Fame
Hall of Fame

When I get the replacement for the primary, what will happen when I insert the new blade?

Make sure the IOS is the same as the existing Sup2T and the replacement supervisor card should be able to synchronize with the existing Sup2T.

since it was the primary, should I take the secondary (which is now active) out of slot 8 and put it into slot 7 first? Or is there no need to do that?

Or is there no need to do that?

That action is unnecessary.

Thanks for taking the time to rate our posts, Colin.  :)