I have a remote pair of production 6509-E switches I need to replace the Supervisors in to support WS-X6716-10T-3C line cards.
Is there any easy way to replace a WS-SUP720-3B with a VS-S2T-10G, preserving the existing swtich/port configurations quickly?
Thanks
Kathie