Hye To All,
In the attached Set-Up, the link that contains the CE500 is meant to be the main link and the other the back up link. To make this possible, i configured the switches as shown on the Set-Up but notwithstanding, it's the back-up link that's the main link. Can someone help me out on this issue?
Thanks for your help in advance.
Julie