Dear community,
We are taking over the infrastructure off a client with an existing Cisco infrastructure.
1 Core Switch 3560
4 Access switches 2960
When i took a look at the config off all switches, i noticed that all switches (core and access) where having a priority off 4096
Do you think this has been done for a reason or is this just misconfigured?
Thanks in advance
Christophe