12-07-2015 07:26 AM - edited 03-08-2019 02:59 AM
I have 4 switches.
2 x WS-C3750X-48P
WS-C3750G-48PS
WS-C3750-48P
If all 4 switches are running the same SW Version will I be able to stack them without loss of features?
They are all currently running 12.2 (55) SE3
The 2 WS-C3750X-48P's are running SW Image C3750E-UNIVERSALK9-M and the other two are running C3750-IPSERVICESK9-M
Please advise.
Thank you
12-07-2015 07:52 AM
What license is installed on the two 3750Xs?
12-07-2015 08:01 AM
IP Base.
12-07-2015 09:41 AM
Disclaimer
The Author of this posting offers the information contained within this posting without consideration and with the reader's understanding that there's no implied or expressed suitability or fitness for any purpose. Information provided is for informational purposes only and should not be construed as rendering professional advice of any kind. Usage of this posting's information is solely at reader's own risk.
Liability Disclaimer
In no event shall Author be liable for any damages wha2tsoever (including, without limitation, damages for loss of use, data or profit) arising out of the use or inability to use the posting's information even if Author has been advised of the possibility of such damage.
Posting
I believe it should work, one of your older model 3750s, with IPServices, should, by default, win the stack master election. As you also have two of those, if the stack master fails, the remaining older 3750 shoud win the stack master election.
BTW, a mixed StackWise and StackWisePlus stack causes the stack to operate in StackWise mode, negating many of the improvements found in StackWisePlus.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide