03-21-2018 08:09 PM - edited 03-08-2019 02:21 PM
Hi,
I have tried googling for answers but failed to find helpful ones.
Currently, I have 2 x 6509 running on VSS. I am using VS-S720-10G-3C supervisor modules on these 6509. I am looking for steps to upgrade my these modules to VS-S720-10-3CXL.
Thank you in advance!
Regards,
Aizat
03-22-2018 03:03 AM - edited 03-22-2018 03:08 AM
Buy the WS-F6K-PFC3CXL daughter card (if they are still available) and install them. `tis as simple as that.
Will there be a downtime? Yes, because the supervisor card will need to be removed in order to install the daughter card.
Catalyst 6500 Series PFC3B and PFC3BXL Installation Note
Don't forget to rate our useful posts.
03-22-2018 03:28 AM
Hi Leo,
Thanks for your reply.
I was just wondering if it is possible to shorten the downtime by performing the following steps:
1. Stop VSS.
2. Change the modules in secondary 6509. Turn it on and let it run live.
3. Change the modules in primary 6509. Turn it on and configure both 6509s to run on VSS.
Thank you,
Aizat
03-22-2018 12:28 PM
Weigh your options carefully.
1. You can get the daughter card and install. Factor in some prolong downtime for the installation.
2. Get a Sup2T or Sup6T with the daughter card already installed.
3. Get a spare Sup720, install the daughter card and insert the card.
03-22-2018 05:39 AM - edited 03-22-2018 05:51 AM
To add to Leo's information, also remember to get the full benefit of upgrading the sup to an XL, you'll want any line cards with a DFC to have a XL (ideally a DFC3CXL). Additionally, although I believe this is in the installation note Leo provided, you need to power cycle (cold boot) the chassis for such a change to also insure all the hardware is fully sync'ed to take advantage of it.
BTW, unless you working with routing tables that exceed the capacity of the non-XL, the XL won't improve your system's performance.
03-22-2018 12:33 PM
03-22-2018 05:37 PM
Hi Leo and Joseph,
Thanks for the advises and tips.
And yes, I already have pfc3cxl, dfc3cxl and 1g mem cards ready to be mounted in their respective modules during this upgrade.
Am I right to say that, assuming there is no hardware issue, after inserting the upgraded modules, I will have to upload my backup config in the engines and things should go well? I mean, is there any additional settings required for XL type setup? Is there anything that I need to take note of?
Thank you,
Aizat