Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hi,
I'm trying to upgrade our production 6509 supervisor 2T 10GE switches from version 15.1(1)SY4 to 15.2(1)SY5. I can copy the image to the slave supervisor with no problem but when I try to copy to the active supervisor I get the following error ...
Hi,I’ve been doing some research into implementing storm control across an enterprise network and have come across some excellent articles. One comment to an article stated (paraphrased):“1) One very important remark everybody seems to miss, is that ...
Hi, I know from the documentation that it's only possible to connect a maximum of four switches in a stack power configuration. I need to have five switches in a data stack, is it possible to configure three switches in one stack power and the other ...
Hi,Is it possible to view the utilisation of individual CFC CPUs on 6500/7600 line cards via CLI? We have an SNMP based management solution that is reporting 100% CPU utilisation on a couple of ethernet modules with CFC daughter cards in a 7609 chass...
Hi,We seem to have a multicast issue on Nexus switches. We have a server that can send a multicast packet to 224.0.0.150 that is received and replied to by a client. But if the same server sends the multicast packet to the address 228.8.8.9 or 228.8....
Hi All, FYI I raised a TAC case and a very helpful engineer asked me to run "fsck bootdisk:" which fixed the issue immediately - I don't think I've used that command for 15 or 20 years on a Cisco switch or router! Anyway, thanks for your replies, all...
Thanks for the replies.
I'm trying to copy the image onto the active bootdisk: and it doesn't matter what method I try, from a TFTP server, an FTP server or from the slavebootdisk: I always get the same error message on the active supervisor, e.g.
...
Hope you don't mind me jumping in on this thread. When you say "Upgrade and reboot the primary switch first"do you mean the configured primary or the operational primary? I have some Nexus switches (albeit N7ks) that are as follows:
vPC role ...