It was time to re-architect and redesign our Data Center Infrastructure. We did the due-diligence, wrote RFPs, researched vendor solutions, attended seminars and researched options before making a decision. We decided on Cisco ACI as our SDN infrastr...
Our 1121 Appliance is EOL. The decision was made not to migrate to ICS, at this time. We decided to migrate from the 1121 appliance ACS 5.6 to VM ACS 5.8. I have been searching for documents on best practices for doing this but have had little succes...
I have 1 2960X located in 1 IDF and 1 2960X located in a 2nd IDF. I have dual fiber connections from each 2960X running back to a pair of interconnected Nexus 5596UP core switchs. I have configured 2 ports on each Nexus as port-channel (18 & 19) with...
Gmonroy,
For now we have no access policies in place. Yes each host is VPC'd to each leaf in the ACI Fabric. They are 12 individual standalone host and each should have it's own VPC to the leaf nodes.
Yes all host are using the same Port-Channel ID...
I am currently reviewing the objects you mentioned above, however something strange happened yesterday that may be a clue. As mentioned in the start of this discussion "..Port 4 seems to be good but the others have a fault on interfaces 5 thru 19. In...
Each ESXi host will connect to the fabric via a 10 Gb port channel. The host will connect to 1 port in leaf101 and 1 port in leaf102. The extra 4 hosts I configured for future use. Those host are not yet installed but will be. Only host 1 thru 12 are...
E1/4 is up
E1/5 - E1/15 is down
Attached properties of e1/4 and E1/t......they look identical to me except for the Channeling State....to me this indicates the host NIC is not configured for LACP Active as it should be.....perhaps the Server Group ne...