cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
398
Views
0
Helpful
3
Replies

Migrating data from Cisco NCS 1.1.1.24 to Prime Infrastructure 1.3 Question

rschwart
Level 1
Level 1

I am spinning up a new VM server for Prime to migrate from NCS. I have not been able to find the patch Cisco recommends to run before upgrading. My question is do I need to run this patch (ncs_patch-1.1.1.24-upgrade-12.tar.gz) if I am just gong to bring up a whole new machine and not upgrade the existing NCS? My plan is to do a back-up on the NCS and a restore from the new Prime.

3 Replies 3

After some work I got a fail message mentioning ram. The VM admin did not increase the size to the same size as the previous VM. So the ram must be the same size on the new VM as the VM your getting the backup from.

Review Cisco Networking for a $25 gift card