cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
493
Views
0
Helpful
0
Replies

WISM Controller and 6500 Switch power cycled

jeremymnhs
Level 1
Level 1

Has anyone come across this issue where if the 6500 switch is reloaded or power cycled that 8 out of 10 interfaces on the WISM become administratively down this does not happen if you reload just the wism or power cycle the controller.

the softwear loaded on the switch is as follows.

Supervisor Engine 720 10GE with f/w 8.5(2) and s/w 12.2(33)SXH

WiSM WLAN Service Module with f/w 12.2(14r)S5 and s/w 12.2(33)SXH

any suggestions as to how to sort this so it loads all the interfaces as up from the power cycle or reload of the switch would be welcome have already made sure the config is saved but still happens.

Jeremy

0 Replies 0
Review Cisco Networking for a $25 gift card