Dear All,
During ICM Router HA failover scenario facing issue with Router Sync status.
Stopped Router B process and Router A MDS status changed from mdsproc - (InSvc Pr-Dsb Clk) to Isolated-enabled (InSvc Is-Enb Clk)
And MDS log also telling mds Connectivity with duplexed partner has been lost.
But in the rttest still, MDS process is showing as B to A or A to B.
Router Sync: 12/07 07:25:20 (5.0 min) (B->A)
If I cycle A side Router process that time Router sync status is ---- and Router A working with simplex mode.
Please confirm what is the issue or any Bug. The same issue for PG failover scenario.
Rttest //
C:\Users\admin>rttest /cust pcce /node routera
RTTEST Release 12.5.1.0 , Build 00834
rttest: status
Router Version: Release 12.5.1.0 , Build 00834
Release Date: 01/26/2020 06:45:34
Current Time: 12/07 07:30:22
Local Time: 12/07 10:30:22 (+3.0 hr)
Router Up: 12/06 11:08:26 (20.3 hr)
Router Sync: 12/07 07:25:20 (5.0 min) (B->A)
State size now: 20,231,288 bytes
State size max: 20,236,832 bytes
MDS Dumplog //
10:22:31:348 ra-mds Connectivity with duplexed partner has been lost due to a failure of the private network, or duplexed partner is out of service.
Last EMT Error [1236]: The network connection was aborted by the local system.
10:22:31:395 ra-mds Initiating test of peer Synchronizer.
10:22:31:411 ra-mds Trace: Sending TOS request: sequence = 1.
10:22:31:473 ra-mds Trace: Received TOS response: sequence=1 status=ENABLED.
10:22:31:473 ra-mds Peer Synchronizer was found to be active.
10:22:31:473 ra-mds Synchronizer suspending operation.
10:22:31:473 ra-mds MDS going out of service.
Ram.S
Regards,