02-14-2019 09:14 PM - edited 03-15-2019 06:45 AM
Hi All
We are going to move the Side B UCCX from one location to another location so we are going to shutdownt the Side B box and it will take 2 days to deilver and fix in the rack
After starting the Side B UCCX do we need to manually sync the data or it will get replicate. Any grace period ?
In below document i could see "retention period" but here its not given a time line.
Solved! Go to Solution.
04-24-2019 05:20 AM
We have done the momment, Post 7 days we have bring back the DR site. Then we faces the DB replication issue.
The TAC has removed the entry from DB and Added again via root account. Post that issue got resolved.
02-15-2019 12:37 AM
04-24-2019 05:20 AM
We have done the momment, Post 7 days we have bring back the DR site. Then we faces the DB replication issue.
The TAC has removed the entry from DB and Added again via root account. Post that issue got resolved.