What's the minum server requirement to build CUCM7.x for a home lab?
I have a DEll Power Edge T100 with the following:
2.00 GHZ Dual Core Processor (can upgrade to 4)
System memory size 8.0 GB
System memory speed 667 MHZ
Bus Speed: 800 MHZ
L2 Cache 1 MB
Is it my understanding that i should install VMware ESXi first then create separate VM for the CUCM7.x suite + Windows server 3 or higher for LDAP and Linux VM like ubuntu server for tftp server etc...
Is this the way to go? Does it matter is the server is 32 bits or 64 bits?
Thanks,