Hello,

 

Our environment recently needed to install the patch on the current ISE server to mitigate vulnerabilities, but we need to install another patch to mitigate a different vulnerability. My question is do I need to remove the first patch and just retain the recent patch? The screenshot attached shows that the installed firmware version is 2.2.0.470 and the patches installed are patch 5 and patch 12.

 

tia

1 Accepted Solution

Accepted Solutions

Surendra
Cisco Employee
Cisco Employee
If you are installing a patch that was released on CCO that was installed previously and you are trying to install another patch on top it, then yes, you can do it. You do not need to remove the previous patch.

View solution in original post

2 Replies 2

Surendra
Cisco Employee
Cisco Employee
If you are installing a patch that was released on CCO that was installed previously and you are trying to install another patch on top it, then yes, you can do it. You do not need to remove the previous patch.

thank you @Surendra for your response.  :)

 