cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1524
Views
0
Helpful
2
Replies

Cisco Prime 3.7 repeated jobs

Sergio Jose
Level 1
Level 1

Hi all,

My client has upgraded Cisco Prime 3.4 to 3.7. I can´t tell if this situation was in previous version but, on the job dashboard, there are several jobs that have several repeated instances with the same information (I don´t know if this is the normal beaviour or not).

 

In attach is an image with an example.

 

Note:

In the previous year my client had some issues and they told that it was recurring alerts in the system tab with information that some jobs don´t run at scedulled time.

 

Thanks in advance

2 Replies 2

marce1000
VIP
VIP

 

 - Try to remove and or un-schedule the intended job from Prime. Then re-add it again, check if the problem persists.

 M.



-- Each morning when I wake up and look into the mirror I always say ' Why am I so brilliant ? '
    When the mirror will then always repond to me with ' The only thing that exceeds your brilliance is your beauty! '

Hello Marce1000,

 

Thank you for your reply but these are system jobs, not jobs that the client configured.

Most of the jobs in this situation runs every minute.

Review Cisco Networking for a $25 gift card