Migrating core switch from 3750 to 6500

VAbr AVib
Level 1
Level 1

I am planning to migrate the core switch from cisco 3750 to Cisco catalysts 6513 switch. What could be the best approach to minimize the downtime or avoid disrupting the production. I have couple of thoughts, one method is to build the core and then replace the existing core, another option is to build the new switch as the second VTP server and once it recieves all the VTP information then disconnect the old server.

Please help me to finalize the plan, my intension is to bring up the new core layer without any issues.