cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Announcements
Join Customer Connection to register!
5287
Views
0
Helpful
2
Replies
ROLAND CUNZ
Beginner

C6500 - %CONST_DIAG-SP-3-HM_TEST_FAIL

Dear all

We have 2 Cat 6509 connected to 1 Gbps Ethernet WAN Link. On each 6509 we use 2 Gbps IPSec SPA Encryption cards for Encryption. The encrypted traffic goes to a GRE Tunnel. This morning I found some error messages in syslog.

%CONST_DIAG-SP-3-HM_TEST_FAIL: Module 1 TestIPSecEncrypDecrypPkt consecutive failure count:2

There were also several short tunnel downs/ups.

I wonder if there is a bug in the new IOS image 12.2(33)SXI2a. We upgraded to this image last weekend.

I hope someone can help.

Thanks

Roland

2 REPLIES 2
paolo bevilacqua
Hall of Fame Master

I think you should contact the TAC for this kind of problems.

Valentin Vasilev
Beginner

Hello Roland,

What you're dealing with is software BUG in the IOS. This is the Cisco ID: CSCtg08523.

This problem doesn't affect user traffic so you shouldn't be worried too much for it. There is no workaround and you need to upgrade the IOS to solve it.

Valentin