09-13-2018 03:06 AM
Hello Guys
pls find attachment
when the L2 Link Between 3750-X-1 and ASA-1 failed , after that traffic from/to hosts sits in ESXi will be blackholed as ASA-1 still Active node while ASA-2 in standby ( cant forward the traffic up and down , until the active one fail)
Adding 2 link from DMZ switches to each ASAs as a cross link seems properer design
pls Advise on the most proper design
Thanks all
09-13-2018 07:27 AM
09-13-2018 09:52 AM
Hi
For option 1 . the 3750 are just L2 switch , the GW for DMZ hosts is the ASA
For Option 2 , this is the DMZ interface down to L2 Switches
THANKS
09-13-2018 11:03 AM
09-13-2018 02:50 PM
Why not consider ASA as cluster design.
3750X is located in different location ? or same location, if same location why not stack them.
09-14-2018 12:37 AM
yep
3750-X are DMZ Switches , where the the DMZ Servers are connected
09-14-2018 12:46 AM
Is there any reason you are not considering Stacking them ?
09-14-2018 12:49 AM
Hi
Does these 2 3750-X acts as 1 unit if i stack them , i mean do they becomes like similar to VSS
09-14-2018 04:47 AM
yes, they become 1 switch.
09-14-2018 04:56 AM
Do you mean , 2 X Control plane and 2 x Data Plane
09-14-2018 05:38 AM
Switches in Stack, you will have 1 control plane.
suggest to understand Stacking concept, below information help you:
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide