Software-Defined Access (SD-Access)

cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Forum Posts

Hi All,I am planning on installing a Cisco 9300X switch within my fabric site that will act as a L2 handoff border node to support migration. Looking at the Catalyst Center data sheet, the C9300X supports a maxium of 32,000 endpoints when deployed as...

dm2020 by Level 1
  • 490 Views
  • 4 replies
  • 0 Helpful votes

PKI Config push Failed when provisioning WLC from DNAC   WLC#ter mo Mar 4 01:31:42.745: %PKI-3-PKCS12_IMPORT_FAILURE: PKCS #12 import failed for trustpoint: sdn-network-infra-wan. Reason: Failed to read PKCS12 from url: https://20.20.20.20/api/v1/t...

JustTakeTheFirstStep_1-1741058688848.png

Hello, team I’m deploying a DNAC environment version 2.3.7.7-70047 We have 2 C9500 BN/CP in co-located mode and configuring the L3-Handoff link against 2 Firewalls in active/passive cluster. Following BRKENS-2824 documentation due both BN/CP are not ...

Se1r by Level 1
  • 975 Views
  • 6 replies
  • 0 Helpful votes

    interface Vlan1400 description Configured from Catalyst Center mac-address 0000.0c9f.f253 vrf forwarding VN1 ip address 192.168.0.1 255.255.252.0 ip helper-address 172.16.100.101 ip helper-address 172.16.100.102 no ip redirects ip route-c...

Hi together,I would like to find out whether my ideas for migration would work.A small sketch is attached.I would connect a C9300 to the existing C3850 in the branch office.I would initially use an IP transit there so that I have VLANs that I can put...

p11l by Level 1
  • 526 Views
  • 1 replies
  • 0 Helpful votes