Hello,
i have 2 SX250X-24T switches at native stacking and chain stack topology. Switches are connected with 2 cables for stacking to each other, 1 UTP cat6 cable (port te12) and 1 SFP+ DAC cable (port te24).
Now i need to free all 4 SFP+ ports from each switch for connecting a new firewall/router device, so i need to reconfigure stack ports. I would like to reconfigure them to other available RJ45 10G ports (eg XG9 and XG10) at both switches.
The question is, can i do it WITHOUT network downtime (eg dropping current stack config and recreating a new one from scratch)? If yes, please enlighten me about how. If no, i would also need some guidance because i can't find anything related at switch documentation or at that forum.
Thank you in advance for your time.
George