03-20-2008 01:31 PM - edited 03-05-2019 09:53 PM
During a prolonged power outage all of our stacks came up with the wrong switch as master. All of the stack each have a 3750G to be the master. I have set priorities on all of the stacks but my question is on the reload should I reload or pull the plug(s) and plug all of the stack back in within the twenty seconds allowed for an election?
Will this force a topology change in the network?
Thank You
03-20-2008 06:40 PM
If you have the set the priorities correctly you will need to reload the entire stack.
Regards
03-21-2008 06:50 AM
Since this will change the stack order will this cause a topology change?
I need to know this since I am operating in a production environment with many PLC's dependent on the network for uninterrupted data flow to meet federal regs. I would like to keep the stack off-line for less than one minute however if a topology change happpens then the entire network could be down for the several minutes while the new tables are created.
Thank You
03-21-2008 07:39 AM
Since this will change the stack order will this cause a topology change?
How many other switches in the network?
Is this stack the root of any Spanning-Tree?
Is this stack a transit switch between leaf and root switches?
If a switch is considered a 'leaf' switch, no traffic goes via this switch as transit, a reboot will most likely only affect locally attached devices.
HTH,
__
Edison.