02-20-2014 08:22 AM - edited 03-07-2019 06:19 PM
Hello,
I would like to add a second supervisor WS-SUP32-GE-3B to a Catalys 6504 runnion IOS 12.2(33).
Which is the best procedure in order to add the second supervisor ( all supervison will have the same IOS on board) with no outage ?
Thanks
02-20-2014 08:55 AM
Online Insertion and Removal means that you can add the new card while the switch is up and running. This document gives some background and things to look out for:
http://www.cisco.com/c/en/us/support/docs/switches/catalyst-6500-series-switches/71585-cat6k-red-supeng-swimg-upg.html
I would be tempted to do this during a scheduled maintenance window though if possible.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide
Log in to Community