Hi guys/girls
I have what is probably an extremely simple problem. Ive been told to add vtp passwords to an existing live network and was wondering the best order in which to upgrade the switches?
The network consists of 2 4500 core switches, one active the other in standby, both in server mode. Then there are 5 3560 connected to both of these and they are in client mode. finally have 2 3560 in transparent mode.
Adding vtp passwords is simple enough but im a newbie and have never written a test plan. i can test by simply adding a vlan, but this being a plan, i have to extend this somehow. Any more ideas on how i can test?
thanks