04-23-2014 04:53 PM - edited 03-07-2019 07:11 PM
I have an initial SG300-10 installed and have run out of RJ-45 ports.
Is there a "best practice" or preferred procedure to daisy chain a 2nd SG300-10 to the 1st switch?
Thanks.
Solved! Go to Solution.
04-23-2014 05:56 PM
These switches are not stack able. Just add a second switch and uplink it just like the other 10.
HTH
04-23-2014 05:56 PM
These switches are not stack able. Just add a second switch and uplink it just like the other 10.
HTH
04-24-2014 04:43 PM
OK, thanks for the quick reply.