You should be able to turn off the standby switch only, disconnect all the cables, and move it to the new location. Once installed and cabled in the new location, turn on the switch and it should come up as standby. Check the status of the stack by issuing the "sh redundancy" command. Ensure you do all these in a maintenance window as you never know what can go wrong.
HTH