01-15-2019 05:45 AM - edited 03-08-2019 05:02 PM
Hi,
Have configured 2 Catalyst 9500 switches in SVL with 1 dual-active link and 2 SVL links.
Now the switches are in Active-Standby state and whenever we try to reload Core 2 switch[that is Standby switch], we are getting below message -
"Stack is in Half ring setup; Reloading a switch might cause stack split message".
The actual issue is, we have also connected 2 WLC with LAG enabled. So whenever we reload the Standby device, WLC loses its HA and again form HA after few seconds[We are receive atleast 15-20 Request time out before WLC will again for the HA]. This issue is exactly seem when the switch comes up and trying to for the stand-by switch[issue observed when the Current state is 'HA sync in progress'].
Because of this, whenever the Stand-by switch reloaded and when it tries to form the HA, all the users connected through Wireless will loose connectivity for few seconds until the issue is HA resolved.
Tried to open the Wireless TAC and we are working on the same, but it seems to be the issue from Catalyst 9500 switch and due to above mentioned message.
WLC IOS version - 8.5.140.0 [most stable version according to Cisco TAC]
Catalyst 9500 IOS version - 16.9.1
SVL configuration on SWITCH -
interface TenGigabitEthernet1/0/38
stackwise-virtual dual-active-detection
description "SVL Dual-Active Detection Link"
interface TenGigabitEthernet2/0/38
stackwise-virtual dual-active-detection
description "SVL Dual-Active Detection Link"
interface TenGigabitEthernet1/0/39
stackwise-virtual link 1
description "SVL StackWise Virtual Link-1"
interface TenGigabitEthernet2/0/39
stackwise-virtual link 1
description "SVL StackWise Virtual Link-1"
interface TenGigabitEthernet1/0/40
stackwise-virtual link 1
description "SVL StackWise Virtual Link-1"
interface TenGigabitEthernet2/0/40
stackwise-virtual link 1
description "SVL StackWise Virtual Link-1"
show switch
Switch/Stack Mac Address : 5061.bf28.9d00 - Local Mac Address
Mac persistency wait time: Indefinite
H/W Current
Switch# Role Mac Address Priority Version State
-------------------------------------------------------------------------------------
*1 Active 5061.bf28.9d00 1 V01 Ready
2 Standby 5061.bf28.a380 1 V01 HA sync in progress
Experts, please help.
Thanks,
Laukik.
01-15-2019 06:06 AM
Hello,
the message you get is informational and would also pop up when you would manually force a switchover (redundancy force-switchover).
That said, are your switches configured for stateful switchover (SSO) ?
01-15-2019 07:01 AM
01-15-2019 07:20 AM
01-15-2019 07:29 AM
01-15-2019 08:29 AM
01-15-2019 09:57 AM
Hi Mark,
Is this only happening to wireless users ?
No, not just wireless users, but wired users are also affected only when the switch is trying to get into Stand-by role and not before that.
But there is one interesting/weird behavior we did observ[from LAN / Wireless users] , is that when we keep continuous ping to 8.8.8.8 , we loose the ping response as soon as we reload the Stand-by switch[Telnet/SSH connection is also lost, needs to reset the connection via PUTTY] and once it gets back to Stand-by role, the ping response comes up. But during this whole time internet of the users is working fine even when we see ping drop to 8.8.8.8.
But as the WLC HA also fails, all the AP's are getting disconnected and it takes time to re-connect [atleast 15-20 Request time out] and as most of the users are connected via wireless getting lot of complaints.
If this is how catalyst 9500 works, seems it needs to be fixed at the earliest, as 9500 are used as Core switches.
Also I don't think this could be the behavior of the catalyst 9500 switches when configured as SVL. But if it is, please let us know.
Catalyst 9500 IOS image - 16.9.1
Thanks,
Laukik
01-29-2020 02:27 PM
Hi Laukik, did you find and fix the issue?
02-17-2023 08:57 AM
this is a bit late/old, but -
What is the config on the ports leading to your WLC?
I am wondering if it is etherchannel mode "on", you should use mode active.
(for a transition, you could set the switch as mode passive, then reconfigure the WLC to active, but then you want to set the switch to active too).
It sounds to me like load balancing kicks in when the link/line comes up and the switch isn't actually ready.
(Fully a S.W.A.G. without the interface config)
04-03-2021 06:09 AM
Hi guys,
I had the same issue on my 9500 switch and this message on on it is only an informative message, its not represent a reload problem according Cisco support. I heard from Cisco this informative message will be remove from the newer version after 16.6.x that I'm currently using.
05-26-2021 08:44 AM
Hi, we are running 17.3.3 and this message is still there...
9500_CORE#redundancy reload peer
Stack is in Half ring setup; Reloading a switch might cause stack split
Reload peer [confirm]
Regards,