Hi,
Does anyone have an pointers on the most efficient way of deploying 250 x 3650 access switches these will be in stacks of between 2 and 4 units typically. I am aware of Smart Install but never used it and we also have Prime 2.2 to use once a base config is on the switch. Any recommendations would be welcome before we start.
Thanks
Richard
Look into APIC-EM.
http://www.cisco.com/c/en/us/products/cloud-systems-management/application-policy-infrastructure-controller-enterprise-module/index.html
Thanks William. Will do.
Hi William,
Do you know if it is possible to use "Smart Install" on an IPv6 network?
Thanks for your help.
- David -
I expect that it is not dependent upon the addressing structure. I cannot say for sure, as I have not tried it.
If you do try it, I would love to know how it went.
Best of luck,
Bill