Convert standalone switch to stack with no downtime.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
08-26-2021 05:42 AM
Hello Team,
Can I convert production standalone switch to stack switch(2xC9300) by connecting them with stack cables without any downtime for the first active switch? I will change priority on active switch to 15 and then provision the second switch first but would the production switch reload itself once the second switch will be powered on?
- Labels:
-
Catalyst 9000
-
LAN Switching
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
08-26-2021 05:47 AM
Yes. This is possible.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
08-26-2021 06:03 AM
Is there any other way to have this done without any downtime of production?
Thanks for the reply.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
08-26-2021 03:41 PM
@WRB1 wrote:
Is there any other way to have this done without any downtime of production?
Same question. Same answer.
