Convert standalone switch to stack with no downtime.

WRB1
Level 1
Level 1

Hello Team,

Can I convert production standalone switch to stack switch(2xC9300) by connecting them with stack cables without any downtime for the first active switch?  I will change priority on active switch to 15 and then provision the second switch first but would the production switch reload itself once the second switch will be powered on?

3 Replies 3

Leo Laohoo
Hall of Fame
Hall of Fame

Yes.  This is possible.

Is there any other way to have this done without any downtime of production?
Thanks for the reply.


@WRB1 wrote:

Is there any other way to have this done without any downtime of production?


Same question.  Same answer.