11-15-2013 07:45 AM - edited 03-07-2019 04:38 PM
Hi. I have 8 switches in a stack. 3 of them are 3750X with POE. 1 is 3750Gv2 and the rest are 3750v2 10/100. I have 3 Network modules (
C3KX-NM-1G) for the 3750X's that provide 4 1gbps SFP ports. Can I install them to the 3750X without taking the whole core switch stack down?
IOS is 12.2(55)SE8.
Thanks.
11-15-2013 09:01 AM
Hi Keith
This is pulled from the installation notes for those modules:
Although network modules are hot-swappable, we recommend installing a network module before powering the switch.
There is a small risk when removing anything which claims to be hot swappable but I have never had an issue.
Source -
11-15-2013 09:01 AM
Disclaimer
The Author of this posting offers the information contained within this posting without consideration and with the reader's understanding that there's no implied or expressed suitability or fitness for any purpose. Information provided is for informational purposes only and should not be construed as rendering professional advice of any kind. Usage of this posting's information is solely at reader's own risk.
Liability Disclaimer
In no event shall Author be liable for any damages whatsoever (including, without limitation, damages for loss of use, data or profit) arising out of the use or inability to use the posting's information even if Author has been advised of the possibility of such damage.
Posting
I think I recall the -X module slot is NOT hot swapable. If that's correct, you would only need to power down a stack member, not the whole stack, to add the module card.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide