cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1477
Views
0
Helpful
7
Replies

Link Aggregation Configuration

MARTIN HUERTER
Level 1
Level 1

I have two pairs of VSS catalyst 6500 switches and in between them I would like to place a pair of Source Fire FirePOWER appliances. The appliances look like layer 2 switches and can be configured for link aggregation, but wanted to get verification they would work properly as depicted in the diagram below. As you can see, interface Port-channel 9 between the Catalyst 6500 switches is a routed link and is currently configured this way on the VSS pairs.

 

 

 

 

diagram

 

 

7 Replies 7

I think it will not work as currently lacp is running between 2 devices (both are logically one and have one lacp id). When you introduce another layer 2 device and bundle it up, each switch sees neighbor as 2 devices...and 2 links will not join the same bundle on each 6500.

 

Thanks,

Madhu

 

 

Madhu,

Thank you for your response. I have two diagrams, one is "Option A" and the other is "Option B". Which one of these two should I configure my LAG interfaces? I am guessing Option A will work?

 

Thanks,

Martin

 

 

Hello Martin,

 

I took a look at both. I can't spot a difference apart from Port-channel numbering being used, but configuration and funcationality its the same.  Thought option A seems clearer to understand.

 

I think it should work, I hope you are planning to create 2 port-channels group in each Layer 2 (one upwards to VSS and one downwards to VSS).

 

However if you are making it on production devices, please plan a sufficient Maintenance window time inorder to carry this out. Consider incase of issues you need to back out also. 

 

Hope this helps and please rate all useful posts..

 

Thanks,

Madhu

 

One more thing i am thinking it may not give you an intended result. Looking at your current topology, you have a port-channel having 4 links between 2 switches.

When you introduce this layer devices, one of the path may get blocked by STP. As we 2 redundant L2 path between 2 VSS switches. Did you get my point? 

 

Thanks,

Madhu

 

 

 

 

Madhu,

 

Thanks for your response. Could I use either ECMP or ECLB to solve the STP problem between the appliances and the VSS pairs?

 

Thanks,

Martin

 

 


 

Hello Martin,


Can you explain ECMP or ECLB in this context? How you are going/planning to do that?

 

Thanks,
Madhu

Madhu,

 

The LAG links between the VSS pairs will be running as layer 3 links on top of OSPF.  See attached diagram called appliance4.jpg.

 

Thanks,

Martin