Hi,
Sometime ago, we installed 2 x 3750 switches connected by stackwise cable. I followed the instruction to boot up Switch A first and after 20 seconds Switch B.
Then I configured an IP address to the stack.
Then one day, there was a prolonged power outage. When power finally came back up, Switch B became the master instead of Switch A.
Is there a way to assign Switch A to be the Master without rebooting them again?