Procedures of checking a ready-to-go Cat4506.

IconDavid
Level 1
Level 1

I have a ready Cat4506, which will be for testing, including its hardware and configuration. Could someone let me know the procedures? Thanks.

 

 

David

2 Replies 2

Reza Sharifi
Hall of Fame
Hall of Fame

David,

There is no standard template and every organization may have their own. If you already have existing devices in place and production, take a look at their config and follow the same procedures. 

For example, if you use NTP on the existing network, configure the same NTP parameters for this switch as well.  If you are running specific STP protocol, you may want to configure the new switch the same as the other ones and so on...

HTH

Thank you Reza.