Hi,
Present 4 switches are in Stacking need to break the stack and re-connecting the stack for 2 switches and new stack for 2 switches. what steps need to follow to break the stack and reconnecting the stack.
Present output.
switch 1 provision c9200l-48t-4x
switch 2 provision c9200l-48t-4x
switch 3 provision c9200l-48t-4x
switch 4 provision c9200l-48t-4x
I need ,,
switch 1 provision c9200l-48t-4x
switch 2 provision c9200l-48t-4x
switch 1 provision c9200l-48t-4x
switch 2 provision c9200l-48t-4x